Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 6, 2018, 06:31 AM
  • 02 0882_02 0881_05072018_234836.mp4

Date
07/05/2018
W/O
712060
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00249
PipeID
P03449
Time
11:31 PM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K4005
Sewer Name
02 DOWNEY TRUNK
City
DOWNEY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
27
Purpose
Maintenance Related
Project
WO_712060_TV02050_JUL2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 0882
Downstream MH
02 0881
Dir. of Survey
Downstream
Length Surveyed
297.9 ft.
Total Length
297.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
4131
O&M Rating
11
Overall Index
3
Overall Quick
Overall Rating
14
Pipe schematic from manhole 02 0882 to 02 0881
MH: 02 0882MH: 02 0881downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 08822.2 ft. MGO - General Observation - MAG COAT2.2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES52.3 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 04 o'clock, , within 8 inches of joint: YES53.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"139.1 ft. TBI - Tap Break-In Intruding, at 12 o'clock, -, -, within 8 inches of joint: YES, 8", 2"152.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"158.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"160.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"162.4 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"191.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"255.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"295.6 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish297.9 ft. AMH - Downstream Manhole, Survey Ends - 02 0881

Observation photos (4)

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES

    2.2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 04 o'clock,  , within 8 inches of joint: YES

    52.3 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 04 o'clock, , within 8 inches of joint: YES

  • Tap Break-In Intruding, at 12 o'clock, -, -, within 8 inches of joint: YES, 8", 2"

    139.1 ft. - Tap Break-In Intruding, at 12 o'clock, -, -, within 8 inches of joint: YES, 8", 2"

Observations (17)

DistanceCodeObservation
297.9AMH02 0881
0MWL
295.6SAV
139.1TBI
52.3DAGS
152.4TFC
255.8TF
160.1TB
53.3TF
162.4TB
158.5TB
0MWM
2.2MGOMAG COAT
2.2SAV
0AMH02 0882
2.2DAGS
191.4TFC

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2018-07-05T23:31:17-07:00