18 0885_18 0884 _03072018_164153.mp4
3.6 ft. - Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start - MAGNEZIUM H.O COATING FLAKING
3.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
3.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
10.8 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
146.2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
189.7 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
286 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
292.3 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 18 0885 |
| 292.3 | SRC | — |
| 10.8 | SRC | — |
| 189.7 | SRC | — |
| 286 | SAP | — |
| 0 | MWL | — |
| 146.2 | SRV | — |
| 189.7 | SRV | — |
| 608.1 | SAP | — |
| 611.2 | MGO | SERVICE CONNECTION AT 9 O'CLOCK AT MH |
| 608.1 | SRC | — |
| 611.2 | AMH | 18 0884 |
| 608.1 | DAZ | — |
| 3.6 | DAZ | MAGNEZIUM H.O COATING FLAKING |
| 3.6 | DAGS | — |
| 262.9 | SRC | — |
| 0 | MWM | — |
| 118 | SRC | — |
| 3.6 | SAP | — |
| 608.1 | DAGS | — |
| 263.1 | SAP | — |