Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 5, 2018, 10:35 AM
  • 22 0715_22 0714 _11052018309_023546.mp4

Date
11/05/2018
W/O
735127
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00826
PipeID
P17069
Time
2:35 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6195
Sewer Name
22 SAN DIMAS CONNECTION EXTENSION TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_735127_TV22167_NOV2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0715
Downstream MH
22 0714
Dir. of Survey
Downstream
Length Surveyed
285.6 ft.
Total Length
285.6 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
168
O&M Index
2
O&M Quick
2J00
O&M Rating
112
Overall Index
3
Overall Quick
Overall Rating
280
Pipe schematic from manhole 22 0715 to 22 0714
MH: 22 0715MH: 22 0714downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 AND 6 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 07152 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start106.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"173 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"283.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish283.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE283.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish285.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0714

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    283.9 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (12)

DistanceCodeObservation
283.9DAGS
283.9MGOCOCKROACHES IN MANHOLE
283.9SAP
173TFC
0MWM
0MWL
106.7TFC
285.6AMH22 0714
0MGOACTIVE CONNECTION AT MH 9 AND 6 O'CLOCK
0AMH22 0715
2SAP
2DAGS

Properties (4)

additional_info
SC365361
custom_field_two
2
customer
LACSD
datetime
2018-11-05T02:35:27-08:00