Wastewater/Activity/PacpInspection/1.0Nov 5, 2018, 09:25 AM
  • 22 0393_22 0392 _11052018309_012504.mp4

Date
11/05/2018
W/O
735036
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00831
PipeID
P16727
Time
1:25 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6194
Sewer Name
22 WALNUT CREEK TRUNK, SECTION 3
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
33
Purpose
Routine Assessment
Project
RFIR_WO_735036_TV22065_NOV2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0393
Downstream MH
22 0392
Dir. of Survey
Downstream
Length Surveyed
303 ft.
Total Length
303 ft.
Structural Index
3
Structural Quick
3K2I
Structural Rating
276
O&M Index
2
O&M Quick
2K12
O&M Rating
122
Overall Index
2
Overall Quick
Overall Rating
398
Pipe schematic from manhole 22 0393 to 22 0392
MH: 22 0393MH: 22 0392downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 03930 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start63 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start245.5 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR251 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR301.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish301.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish301.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish303 ft. AMH - Downstream Manhole, Survey Ends - 22 0392

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    63 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR

    245.5 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR

  • Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR

    251 ft. - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR

Observations (12)

DistanceCodeObservation
2SAP
301.6SAP
0MWM
303AMH22 0392
301.6SSS
0AMH22 0393
301.6DAGS
251RFJ
0MWL
2DAGS
63SSS
245.5RFJ

Properties (4)

additional_info
SC365360
custom_field_two
2
customer
LACSD
datetime
2018-11-05T01:25:02-08:00