Wastewater/Activity/PacpInspection/1.0Oct 25, 2018, 09:16 AM
  • 20 0255_20 0254_25102018_021621.mp4

Date
10/25/2018
W/O
729481
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00753
PipeID
P19222
Time
2:16 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6183
Sewer Name
20 35TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_729481_TV20009_OCT2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0255
Downstream MH
20 0254
Dir. of Survey
Downstream
Length Surveyed
378.4 ft.
Total Length
378.4 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
375
O&M Index
2
O&M Quick
412N
O&M Rating
154
Overall Index
2
Overall Quick
Overall Rating
529
Pipe schematic from manhole 20 0255 to 20 0254
MH: 20 0255MH: 20 0254downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 02550 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start10.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"59 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"110.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"158.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"210.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"258.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"310.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"357.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"376.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish376.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish378.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish378.4 ft. AMH - Downstream Manhole, Survey Ends - 20 0254

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
0MWL
357.8TFC
310.2TFC
110.4TFC
376.5SSS
158.5TFC
210.4TFC
10.9TFC
2DAGS
0AMH20 0255
258.6TFC
59TFC
2SAP
0MWM
378.4DAGS
378.4AMH20 0254
2SSS
376.5SAP

Properties (4)

additional_info
SC365148
custom_field_two
2
customer
LACSD
datetime
2018-10-25T02:16:05-07:00