Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 16, 2018, 01:11 PM
  • 02 1757A_02 1757_11162018_051450.mp4

Date
11/16/2018
W/O
0739479
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00254
PipeID
P04102
Time
5:11 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1055R
Sewer Name
02 DOWNEY-BELLFLOWER EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
15
Purpose
Maintenance Related
Project
20181116MDM_DOWNEY_BELLFLOWER_EXTENSION_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
02 1757A
Downstream MH
02 1757
Dir. of Survey
Downstream
Length Surveyed
196.8 ft.
Total Length
196.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
5141
O&M Rating
61
Overall Index
3
Overall Quick
Overall Rating
61
Pipe schematic from manhole 02 1757A to 02 1757
MH: 02 1757AMH: 02 1757downstream0 ft. AMH - Upstream Manhole, Survey Begins - 5:15AM0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 80 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open8.4 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 10 %, within 8 inches of joint: YESR10.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start14.3 ft. RMJ - Roots Medium Joint, from 08 to 10 o'clock, 5 %, within 8 inches of joint: YESR17.5 ft. RMJ - Roots Medium Joint, from 07 to 09 o'clock, 10 %, within 8 inches of joint: YESR20.9 ft. RMJ - Roots Medium Joint, from 03 to 09 o'clock, 5 %, within 8 inches of joint: YESR, Start25.9 ft. RMJ - Roots Medium Joint, from 07 to 10 o'clock, 20 %, within 8 inches of joint: YESR29 ft. RMJ - Roots Medium Joint, from 03 to 05 o'clock, 15 %, within 8 inches of joint: YESR30.5 ft. MWL - Water Level, 35 %of cross sectional area35.4 ft. RMJ - Roots Medium Joint, at 09 o'clock, 20 %, within 8 inches of joint: YESR41 ft. RMJ - Roots Medium Joint, from 07 to 10 o'clock, 15 %, within 8 inches of joint: YESR44.8 ft. RMJ - Roots Medium Joint, from 03 to 09 o'clock, 15 %, within 8 inches of joint: YESR50.5 ft. RMJ - Roots Medium Joint, from 03 to 09 o'clock, 25 %, within 8 inches of joint: YESR, Start - POSSIBLE UNDER FLOW53.7 ft. RMJ - Roots Medium Joint, from 03 to 09 o'clock, 10 %, within 8 inches of joint: YESR107.3 ft. TFD - Tap Factory Made Defective, at 12 o'clock, -, within 8 inches of joint: YES, 6" - OPEN-90% ROOTS107.4 ft. RBL - Roots Ball Lateral, from 07 to 05 o'clock, 55 %, within 8 inches of joint: YES108.9 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 35 %, within 8 inches of joint: YESR129.5 ft. RMJ - Roots Medium Joint, from 07 to 05 o'clock, 35 %, within 8 inches of joint: YESR132.1 ft. RMJ - Roots Medium Joint, from 07 to 05 o'clock, 35 %, within 8 inches of joint: YESR138.5 ft. RMJ - Roots Medium Joint, from 07 to 05 o'clock, 35 %, within 8 inches of joint: YESR141.9 ft. RMJ - Roots Medium Joint, from 07 to 05 o'clock, 15 %, within 8 inches of joint: YESR, Start141.9 ft. RMJ - Roots Medium Joint, from 03 to 09 o'clock, 5 %, within 8 inches of joint: YESR, Finish141.9 ft. MWL - Water Level, 10 %of cross sectional area141.9 ft. MWM - Water Mark, 30 %of cross sectional area141.9 ft. RMJ - Roots Medium Joint, from 03 to 09 o'clock, 25 %, within 8 inches of joint: YESR, Finish196.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Capped196.2 ft. RMJ - Roots Medium Joint, from 07 to 05 o'clock, 15 %, within 8 inches of joint: YESR, Finish196.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish196.8 ft. AMH - Downstream Manhole, Survey Ends - 5:55AM

Observation photos (12)

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    10.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

  • Roots Medium Joint, from 07 to 10 o'clock, 20 %, within 8 inches of joint: YESR

    25.9 ft. - Roots Medium Joint, from 07 to 10 o'clock, 20 %, within 8 inches of joint: YESR

  • Roots Medium Joint, at 09 o'clock, 20 %, within 8 inches of joint: YESR

    35.4 ft. - Roots Medium Joint, at 09 o'clock, 20 %, within 8 inches of joint: YESR

  • Roots Medium Joint, from 07 to 10 o'clock, 15 %, within 8 inches of joint: YESR

    41 ft. - Roots Medium Joint, from 07 to 10 o'clock, 15 %, within 8 inches of joint: YESR

  • Roots Medium Joint, from 03 to 09 o'clock, 25 %, within 8 inches of joint: YESR, Start - POSSIBLE UNDER FLOW

    50.5 ft. - Roots Medium Joint, from 03 to 09 o'clock, 25 %, within 8 inches of joint: YESR, Start - POSSIBLE UNDER FLOW

  • Tap Factory Made Defective, at 12 o'clock, -, within 8 inches of joint: YES, 6" - OPEN-90% ROOTS

    107.3 ft. - Tap Factory Made Defective, at 12 o'clock, -, within 8 inches of joint: YES, 6" - OPEN-90% ROOTS

  • Roots Ball Lateral, from 07 to 05 o'clock, 55 %, within 8 inches of joint: YES

    107.4 ft. - Roots Ball Lateral, from 07 to 05 o'clock, 55 %, within 8 inches of joint: YES

  • Roots Medium Joint, from 08 to 04 o'clock, 35 %, within 8 inches of joint: YESR

    108.9 ft. - Roots Medium Joint, from 08 to 04 o'clock, 35 %, within 8 inches of joint: YESR

  • Roots Medium Joint, from 07 to 05 o'clock, 35 %, within 8 inches of joint: YESR

    129.5 ft. - Roots Medium Joint, from 07 to 05 o'clock, 35 %, within 8 inches of joint: YESR

  • Roots Medium Joint, from 07 to 05 o'clock, 35 %, within 8 inches of joint: YESR

    132.1 ft. - Roots Medium Joint, from 07 to 05 o'clock, 35 %, within 8 inches of joint: YESR

  • Roots Medium Joint, from 07 to 05 o'clock, 35 %, within 8 inches of joint: YESR

    138.5 ft. - Roots Medium Joint, from 07 to 05 o'clock, 35 %, within 8 inches of joint: YESR

  • Roots Medium Joint, from 07 to 05 o'clock, 15 %, within 8 inches of joint: YESR, Start

    141.9 ft. - Roots Medium Joint, from 07 to 05 o'clock, 15 %, within 8 inches of joint: YESR, Start

Observations (33)

DistanceCodeObservation
35.4RMJ
4TFOpen
41RMJ
53.7RMJ
141.9RMJ
138.5RMJ
141.9RMJ
0AMH5:15AM
196.2MGOConn. @ Mh, 3 O' Clock. Capped
17.5RMJ
44.8RMJ
25.9RMJ
108.9RMJ
50.5RMJPOSSIBLE UNDER FLOW
129.5RMJ
107.4RBL
132.1RMJ
141.9MWL
0MWL
141.9MWM
14.3RMJ
196.2RMJ
10.8DAGS
196.2DAGS
8.4RMJ
29RMJ
20.9RMJ
107.3TFDOPEN-90% ROOTS
0MWM
141.9RMJ
0MGOConn. @ Mh, 3 O' Clock. Active
196.8AMH5:55AM
30.5MWL

Properties (4)

customer
LACSD
datetime
2018-11-16T05:11:08-08:00
documentation
MARTIN,REVELES,OLIVER 111,BRAR
is_lateral_inspection
false