05 0427_05 0426_11142018_021648.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - FLAKING PEELING CONCRETE
2 ft. - General Observation - MAG COAT 98% START 9:00 TO 3:00
8 ft. - General Photograph - MAG COAT
26.5 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - FLAKING CONCRETE
34.8 ft. - Surface Spalling, from 12 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE UNDER MAG COAT
39.2 ft. - Surface Spalling, from 02 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
71.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
133.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - FLAKING PEELING CONCRETE
442.4 ft. - Surface Spalling, at 02 o'clock, within 8 inches of joint: NO - FLAKING CONCRETE
| Distance | Code | Observation |
|---|---|---|
| 491 | SSS | FLAKING PEELING CONCRETE |
| 2 | SSS | FLAKING PEELING CONCRETE |
| 491 | DAGS | — |
| 0 | MWM | — |
| 34.8 | SSS | PEELING CONCRETE UNDER MAG COAT |
| 39.2 | SSS | PEELING CONCRETE |
| 0 | MWL | — |
| 26.5 | SSS | FLAKING CONCRETE |
| 0 | AMH | 2:15AM |
| 71.4 | DAGS | — |
| 133.1 | SSS | FLAKING PEELING CONCRETE |
| 2 | MGO | MAG COAT 98% START 9:00 TO 3:00 |
| 491 | MGO | 98% MAG COAT FINISH |
| 442.4 | SSS | FLAKING CONCRETE |
| 491.9 | AMH | 2:50AM |
| 8 | MGP | MAG COAT |