05 1545_05 1544A_1182018_094440.mp4
5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
30.5 ft. - Surface Reinforcement Visible, from 08 to 10 o'clock, within 8 inches of joint: YES
70.4 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start
208.7 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start
250.5 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES
313.8 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start
337.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
338.9 ft. - Surface Reinforcement Visible, from 09 to 01 o'clock, within 8 inches of joint: YES, Start
354.8 ft. - Surface Reinforcement Visible, from 09 to 01 o'clock, within 8 inches of joint: YES, Start
408.7 ft. - Surface Missing Wall, from 12 to 01 o'clock, within 8 inches of joint: NO - HOLE WITH A VOID IN THE PIPE
460.6 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES
463.1 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES
645.1 ft. - Downstream Manhole, Survey Ends - MH 1544A
| Distance | Code | Observation |
|---|---|---|
| 250.5 | SRV | — |
| 5 | SAV | — |
| 640.7 | SAP | — |
| 338.9 | SRV | — |
| 0 | AMH | MH 1545 |
| 0 | MWL | — |
| 30.5 | SRV | — |
| 645.1 | MGO | ACTIVE CONNECTION IN THE MH @ 3 |
| 216.4 | SRV | — |
| 460.6 | SRV | — |
| 313.8 | SRV | — |
| 408.7 | SMW | HOLE WITH A VOID IN THE PIPE |
| 645.1 | AMH | MH 1544A |
| 208.7 | SRV | — |
| 70.4 | SSS | — |
| 463.1 | SRV | — |
| 354.8 | SRV | — |
| 337.3 | SAP | — |
| 351.6 | TFA | — |
| 376.8 | SRV | — |
| 0 | MWM | — |
| 640.7 | SSS | — |
| 320 | SRV | — |
| 337.3 | SAV | — |
| 348 | SRV | — |