Wastewater/Activity/PacpInspection/1.0Oct 31, 2018, 05:11 AM
  • 22 0132_22 0131 _30102018_221138.mp4

Date
10/30/2018
W/O
734336
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00805
PipeID
P16374
Time
10:11 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6189
Sewer Name
22 DISTRICT #22 MAIN TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
27
Purpose
Routine Assessment
Project
WO_734336_TV22033_NOV2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
22 0132
Downstream MH
22 0131
Dir. of Survey
Downstream
Length Surveyed
370.5 ft.
Total Length
370.5 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
365
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
373
Pipe schematic from manhole 22 0132 to 22 0131
MH: 22 0132MH: 22 0131downstream0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 01320 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start35.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"62 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"145 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"176.6 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"214.2 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"282.5 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"355.5 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"368.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish368.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish368.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish370.5 ft. AMH - Downstream Manhole, Survey Ends - 22 0131370.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (4)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    370.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (18)

DistanceCodeObservation
35.7TFC
176.6TBA
2SSS
370.5AMH22 0131
2SAP
0MWL
368.7DAGS
0AMH22 0132
368.7SSS
62TBA
0MWM
368.7SAP
2DAGS
355.5TBA
145TBA
214.2TBA
282.5TBA
370.5MGOCOCKROACHES IN MANHOLE

Properties (4)