18 0472_18 0471_11212018_032157.mp4
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVRE AGG ATTACHED
2 ft. - General Observation - MAG COAT 60% START 8:00 TO 4:00
4 ft. - Surface Reinforcement Corroded, from 08 to 09 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
19.2 ft. - Surface Reinforcement Corroded, from 08 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
20.1 ft. - Surface Reinforcement Corroded, from 08 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
30.9 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
44.6 ft. - Surface Reinforcement Corroded, from 08 to 11 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
188.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO
191.8 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 2 | SAM | SEVERE AGG |
| 222.6 | SAM | SEVERE AGG |
| 0 | MWM | — |
| 222.6 | MGO | MAG COAT 60% FINISH |
| 20.1 | SRC | CIRCUM REBAR |
| 222.6 | SSS | BLISTERING PEELING CONCRETE |
| 188.5 | SSS | — |
| 105.7 | TF | Open |
| 19.2 | SRC | CIRCUM REBAR |
| 97.5 | TF | Open |
| 0 | AMH | 3:25AM |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 39.9 | TF | Open |
| 2 | SSS | PEELING CONCRETE SEVRE AGG ATTACHED |
| 44.6 | SRC | CIRCUM REBAR |
| 222.9 | AMH | 4:05AM |
| 150.8 | TF | Open |
| 222.6 | SSS | PEELING CONCRETE SEVERE AGG ATTACHED |
| 2 | MGO | MAG COAT 60% START 8:00 TO 4:00 |
| 4 | SRC | CIRCUM REBAR |
| 30.9 | SAM | SEVERE AGG |
| 191.8 | SAM | SEVERE AGG |
| 0 | MWL | — |