03 0622_03 0621_1192018_080157.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
29 ft. - General Photograph
35 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
35.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
40.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
48 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 01 to 05 o'clock, , within 8 inches of joint: YES
111.8 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES
117.8 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
147.4 ft. - Infiltration Runner, at 11 o'clock, within 8 inches of joint: YES
147.4 ft. - Infiltration Dripper, at 11 o'clock, within 8 inches of joint: YES
147.4 ft. - General Photograph - RUNNER
159.4 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 29 | MGP | — |
| 35 | ID | — |
| 147.4 | IR | — |
| 2 | DAGS | — |
| 162.8 | AMH | 8:28 AM |
| 111.8 | CL | — |
| 48 | DAGS | — |
| 162.4 | CM | — |
| 159.4 | ID | — |
| 2 | SSS | — |
| 2 | CM | — |
| 162.4 | SSS | — |
| 160 | DAGS | — |
| 117.8 | DAE | — |
| 35.1 | CM | — |
| 0 | MWM | — |
| 0 | AMH | 7:59 AM |
| 147.4 | ID | — |
| 0 | MWL | — |
| 147.4 | MGP | RUNNER |
| 40.9 | CM | — |
| 162.8 | MGO | GREASE THROUGHOUT THE REACH (5%) |