- Date
- 11/08/2018
- W/O
- 0737993
- Weather
- Dry
- Operator/Surveyor
- SANTIAGO OBREGON
- Sewer ID
- Z00495
- PipeID
- P06765
- Time
- 12:49 PM
- Certificate
- U-1014-06022541
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- G7848
- Sewer Name
- 05 NORTH TORRANCE TRUNK
- City
- TORRANCE
- Loc. details
- Other
- Location Code
- Z
- Use of Sewer
- Sanitary Sewer
- District
- District 05
- Page No.
- 23
- Purpose
- Capital Improvement Program Assesment
- Project
- 20181108SHO_NORTH_TORRANCE_TRUNK
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 18 in.
- Upstream MH
- 05 1542
- Downstream MH
- 05 1541
- Dir. of Survey
- Downstream
- Length Surveyed
- 400.8 ft.
- Total Length
- 400.8 ft.
- Structural Index
- 3
- Structural Quick
- 3300
- Structural Rating
- 9
- O&M Index
- 0
- O&M Quick
- 0000
- O&M Rating
- 0
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 9
Pipe schematic from manhole 05 1542 to 05 1541 Observation photos (3)

2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

8 ft. - Surface Reinforcement Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

200.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start