Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 1, 2018, 08:46 AM
  • H 0631_H 0630 _10012018_020053.mp4

Date
10/01/2018
W/O
729980
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00183
PipeID
P21385
Time
1:46 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6052
Sewer Name
H JOINT OUTFALL H - UNIT 7B
City
CITY OF INDUSTRY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
38
Purpose
Routine Assessment
Project
RFIR_WO_729980_TV15231_OCT2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
H 0631
Downstream MH
H 0630
Dir. of Survey
Downstream
Length Surveyed
199.9 ft.
Total Length
199.9 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
195
O&M Index
2
O&M Quick
412G
O&M Rating
82
Overall Index
2
Overall Quick
Overall Rating
277
Pipe schematic from manhole H 0631 to H 0630
MH: H 0631MH: H 0630downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 06310 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 50 %of cross sectional area0 ft. MWM - Water Mark, 70 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start126.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"195.5 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish195.5 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish195.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish199.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE199.9 ft. AMH - Downstream Manhole, Survey Ends - H 0630

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    199.9 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
195.5SAP
0AMHH 0631
195.5SSS
199.9MGOCOCKROACHES IN MANHOLE
2DAGS
0MGOCOCKROACHES IN MANHOLE
0MWL
199.9AMHH 0630
2SAP
2SSS
126.3TBA
0MWM
195.5DAGS

Properties (4)

additional_info
SC365115
custom_field_two
2
customer
LACSD
datetime
2018-10-01T01:46:23-07:00