Wastewater/Activity/PacpInspection/1.0Oct 17, 2018, 06:51 AM
  • 20 0721_20 0334_16102018_235207.mp4

Date
10/16/2018
W/O
729636
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00755
PipeID
P19284
Time
11:51 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6169
Sewer Name
20 45TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_729636_TV20061_OCT2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0721
Downstream MH
20 0334
Dir. of Survey
Downstream
Length Surveyed
303.2 ft.
Total Length
303.2 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
180
O&M Index
2
O&M Quick
412K
O&M Rating
124
Overall Index
3
Overall Quick
Overall Rating
304
Pipe schematic from manhole 20 0721 to 20 0334
MH: 20 0721MH: 20 0334downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 07210 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 8 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start4.5 ft. MWM - Water Mark, 50 %of cross sectional area55.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"80 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"104.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"128.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"157 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"180.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"204.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"229.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"253.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"269.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"294.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"302.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish302.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish303.2 ft. AMH - Downstream Manhole, Survey Ends - 20 0334

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    4.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
0MWL
0AMH20 0721
302.2SAP
253.8TFC
128.4TFC
303.2AMH20 0334
294.8TFC
229.5TFC
204.9TFC
55.6TFC
104.3TFC
180.6TFC
4.5DAGS
157TFC
2SAP
269.6TFC
0MGOACTIVE CONNECTION AT MH 8 O'CLOCK
4.5MWM
302.2DAGS
80TFC

Properties (4)

additional_info
SC365137
custom_field_two
2
customer
LACSD
datetime
2018-10-16T23:51:30-07:00