Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 15, 2018, 07:56 AM
  • H 0295_H 0294 _15102018_011421.mp4

Date
10/15/2018
W/O
729712
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00174
PipeID
P10750
Time
12:56 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6149
Sewer Name
H JOINT OUTFALL H - UNIT 3
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
21
Purpose
Routine Assessment
Project
WO_729712_TV02323_OCT2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Width
57 in.
Upstream MH
H 0295
Downstream MH
H 0294
Dir. of Survey
Downstream
Length Surveyed
296.1 ft.
Total Length
296.1 ft.
Structural Index
4
Structural Quick
5K3K
Structural Rating
472
O&M Index
3
O&M Quick
3K00
O&M Rating
177
Overall Index
4
Overall Quick
Overall Rating
649
Pipe schematic from manhole H 0295 to H 0294
MH: H 0295MH: H 0294downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 02952.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start - HEAVY SLUDGE2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start295.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"296 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish296 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish296.1 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish296.1 ft. MSA - Survey Abandoned - CAM BLKD BY HEAVY SLUDGE

Observation photos (3)

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start - HEAVY SLUDGE

    2.1 ft. - Deposits Settled Other, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start - HEAVY SLUDGE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
295.8TF
0MWL
296.1DSZ
0MWM
2.1SRV
2.1DSZHEAVY SLUDGE
296SRV
296.1MSACAM BLKD BY HEAVY SLUDGE
2.1SAP
296SAP
0AMHH 0295

Properties (4)

additional_info
SC365216
custom_field_two
5
customer
LACSD
datetime
2018-10-15T00:56:48-07:00