- Date
- 10/11/2018
- W/O
- 729537
- Weather
- Dry
- Operator/Surveyor
- S. LOPEZ
- Sewer ID
- Z00803
- PipeID
- P17240
- Time
- 10:15 PM
- Certificate
- U-111-11880
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K6165
- Sewer Name
- 22 DALTON TRUNK, SECTION 3
- City
- AZUSA
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 22
- Page No.
- 11
- Purpose
- Routine Assessment
- Project
- WO_729537_TV22105_OCT2018
- Sewer Type
- Gravity
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 21 in.
- Width
- 21 in.
- Upstream MH
- H 1283
- Downstream MH
- 22 0872
- Dir. of Survey
- Downstream
- Length Surveyed
- 284.7 ft.
- Total Length
- 284.7 ft.
- Structural Index
- 3
- Structural Quick
- 5J3J
- Structural Rating
- 550
- O&M Index
- 2
- O&M Quick
- 2J00
- O&M Rating
- 112
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 662
Pipe schematic from manhole H 1283 to 22 0872 Observation photos (4)

2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

8.6 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

8.6 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

8.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start