Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 3, 2018, 10:09 AM
  • 02 1800_02 1799_03102018_030948.mp4

Date
10/03/2018
W/O
729724
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00292
PipeID
P04145
Time
3:09 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6126
Sewer Name
02 MONTEREY PARK RELIEF TRUNK
City
EAST LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_729724_TV02215_OCT2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
02 1800
Downstream MH
02 1799
Dir. of Survey
Downstream
Length Surveyed
282.7 ft.
Total Length
282.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 02 1800 to 02 1799
MH: 02 1800MH: 02 1799downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 18000 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area3.2 ft. MGO - General Observation - LINED PIPE29.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"46.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"71.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"91.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"116.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"137.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"155.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"176.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"194.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"221.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"239.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"270 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"272.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"282.7 ft. AMH - Downstream Manhole, Survey Ends - 02 1799

Observations (18)

DistanceCodeObservation
137.2TF
0AMH02 1800
282.7AMH02 1799
0MWM
155.2TF
29.1TF
71.7TF
221.3TF
116.2TF
194.4TF
0MWL
239.5TF
3.2MGOLINED PIPE
272.4TF
46.9TF
270TF
176.5TF
91.9TF

Properties (4)

additional_info
SC364846
custom_field_two
3
customer
LACSD
datetime
2018-10-03T03:09:26-07:00