Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 3, 2018, 09:41 AM
  • 02 1802_02 1801_03102018_024216.mp4

Date
10/03/2018
W/O
729724
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00292
PipeID
P04147
Time
2:41 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6126
Sewer Name
02 MONTEREY PARK RELIEF TRUNK
City
EAST LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_729724_TV02215_OCT2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
02 1802
Downstream MH
02 1801
Dir. of Survey
Downstream
Length Surveyed
284.1 ft.
Total Length
284.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 02 1802 to 02 1801
MH: 02 1802MH: 02 1801downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 18020 ft. MWM - Water Mark, 5 %of cross sectional area3.6 ft. MGO - General Observation - LINED PIPE7.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"40.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"52.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"82.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"91.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"112.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"127.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"166.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"169.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"205.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"208.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"229.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"232.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"284.1 ft. AMH - Downstream Manhole, Survey Ends - 02 1801

Observations (18)

DistanceCodeObservation
169.3TF
40.5TF
208.6TF
232.4TF
52.8TF
205.3TF
0MWL
82.8TF
166.3TF
112.7TF
7.9TF
127.4TF
91.6TF
229.3TF
0AMH02 1802
0MWM
3.6MGOLINED PIPE
284.1AMH02 1801

Properties (4)

additional_info
SC364846
custom_field_two
3
customer
LACSD
datetime
2018-10-03T02:41:18-07:00