Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 8, 2017, 09:21 AM
  • 18 0204_18 0203 _20170308_023641.mp4

Date
03/08/2017
W/O
624437
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00695
PipeID
P14029
Time
1:21 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4313
Sewer Name
18 ORR AND DAY ROAD TRUNK
City
SANTA FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
13
Purpose
Routine Assessment
Project
WO_624437_TV18043_MAR2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
18 0204
Downstream MH
18 0203
Dir. of Survey
Downstream
Length Surveyed
302.8 ft.
Total Length
302.8 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
300
O&M Index
3
O&M Quick
413K
O&M Rating
304
Overall Index
3
Overall Quick
Overall Rating
604
Pipe schematic from manhole 18 0204 to 18 0203
MH: 18 0204MH: 18 0203downstream0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - 18 02040 ft. MWL - Water Level, 40 %of cross sectional area2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start301.6 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish301.6 ft. MGO - General Observation - COCKROACHES IN MANHOLE301.6 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish301.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish301.6 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish301.6 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK302.8 ft. AMH - Downstream Manhole, Survey Ends - 18 0203

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    301.6 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (15)

DistanceCodeObservation
301.6SSS
301.6MGOCOCKROACHES IN MANHOLE
301.6DSZ
2SSS
0MWM
2SAV
2DSZDEBRIS
301.6DAGS
0MGOCOCKROACHES IN MANHOLE
0AMH18 0204
0MWL
301.6SAV
2DAGS
302.8AMH18 0203
301.6MGOACTIVE CONNECTION AT MH 9 O'CLOCK

Properties (4)

additional_info
SC306966
custom_field_two
2
customer
LACSD
datetime
2017-03-08T01:21:16-08:00