Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 2, 2018, 03:31 PM
  • 05 2152_05 2151A_1122018_091058.mp4

Date
11/02/2018
W/O
0737994
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00479
PipeID
P07293
Time
8:31 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7844
Sewer Name
05 MADISON STREET TRUNK
City
TORRANCE
Loc. details
Yard
Location Code
Y
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
35
Purpose
Capital Improvement Program Assesment
Project
20181102SHO_MADISON_STREET_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
05 2152
Downstream MH
05 2151A
Dir. of Survey
Downstream
Length Surveyed
93.1 ft.
Total Length
93.1 ft.
Structural Index
5
Structural Quick
5100
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
5
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 2152 to 05 2151A
MH: 05 2152MH: 05 2151Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - MH 21520 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION IN THE MH @ 30 ft. MWL - Water Level, 20 %of cross sectional area88.8 ft. B - Broken, from 09 to 01 o'clock, within 8 inches of joint: YES93.1 ft. AMH - Downstream Manhole, Survey Ends - MH 2151A93.1 ft. MGO - General Observation - ACTIVE CONNECTION IN THE MH @ 9

Observation photos (1)

  • Broken, from 09 to 01 o'clock, within 8 inches of joint: YES

    88.8 ft. - Broken, from 09 to 01 o'clock, within 8 inches of joint: YES

Observations (7)

DistanceCodeObservation
0AMHMH 2152
0MWM
0MGOCONNECTION IN THE MH @ 3
93.1AMHMH 2151A
0MWL
93.1MGOACTIVE CONNECTION IN THE MH @ 9
88.8B

Properties (7)

additional_info
RFIR
custom_field_three
BROKEN PIPE
custom_field_two
3
customer
LACSD
datetime
2018-11-02T08:31:47-07:00
documentation
OBREGON, YOUNG, RUVALCABA, CASTILLO
is_lateral_inspection
false