Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 1, 2018, 06:15 PM
  • 18 0565_18 0564_1112018_111756.mp4

Date
11/01/2018
W/O
0723445
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00685
PipeID
P14415
Time
11:15 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7843
Sewer Name
18 LA MIRADA RELIEF TRUNK
City
SANTA FE SPRINGS
Loc. details
Railway
Location Code
L
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Routine Assessment
Project
20181101DF_LA_MIRADA_RELIIEF_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Upstream MH
18 0565
Downstream MH
18 0564
Dir. of Survey
Downstream
Length Surveyed
446.7 ft.
Total Length
446.7 ft.
Structural Index
3
Structural Quick
5132
Structural Rating
13
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
15
Pipe schematic from manhole 18 0565 to 18 0564
MH: 18 0565MH: 18 0564downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 11:16 AM0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 75% MAG2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start63.9 ft. MGO - General Observation - ABANDONED MH START67.8 ft. MGO - General Observation - ABANDONED MH END117 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"140.7 ft. MGP - General Photograph140.7 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, at 02 o'clock, , within 8 inches of joint: YES150.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start166.3 ft. MGP - General Photograph188.3 ft. MGP - General Photograph222.9 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"224.6 ft. MGP - General Photograph251.6 ft. MGP - General Photograph319.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"412.2 ft. MGP - General Photograph445.1 ft. MGO - General Observation - ROACHES @ MH445.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish445.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish445.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish445.1 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)445.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish445.1 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach445.1 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 75% MAG446.7 ft. AMH - Downstream Manhole, Survey Ends - 12:01 PM

Observation photos (15)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 75% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 75% MAG

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ABANDONED MH START

    63.9 ft. - General Observation - ABANDONED MH START

  • Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"

    117 ft. - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"

  • General Photograph

    140.7 ft. - General Photograph

  • Deposits Attached Ragging, 5 %of cross sectional area, at 02 o'clock,  , within 8 inches of joint: YES

    140.7 ft. - Deposits Attached Ragging, 5 %of cross sectional area, at 02 o'clock, , within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    150.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    166.3 ft. - General Photograph

  • General Photograph

    188.3 ft. - General Photograph

  • Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"

    222.9 ft. - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"

  • General Photograph

    224.6 ft. - General Photograph

  • General Photograph

    251.6 ft. - General Photograph

  • Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"

    319.6 ft. - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"

  • General Photograph

    412.2 ft. - General Photograph

Observations (29)

DistanceCodeObservation
140.7MGP
445.1MGOROACHES @ MH
445.1SRV
251.6MGP
117TFC
224.6MGP
0MWM
445.1SAP
140.7DAR
222.9TFC
150.4SSS
67.8MGOABANDONED MH END
445.1SSS
2SAP
2SZ75% MAG
2SAV
445.1MGOGREASE THROUGHOUT THE REACH (5%)
0AMH11:16 AM
166.3MGP
445.1SAV
446.7AMH12:01 PM
2SRV
63.9MGOABANDONED MH START
412.2MGP
445.1MGOPeeling & Flaking Throughout The Reach
188.3MGP
319.6TFC
0MWL
445.1SZ75% MAG

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2018-11-01T11:15:31-07:00
documentation
FRANKLIN, IGNACIO, CASTILLO, RUVALCABA
is_lateral_inspection
false