B 0379_B 0378_1162018_035418.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
8 ft. - General Observation - 21" NRCP
26 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
62.1 ft. - General Observation - MAG COAT 20% START
137.2 ft. - Surface Spalling, from 09 to 12 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
226.4 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG
331.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 26 | SAV | SEVERE AGG SPORATIC |
| 137.2 | SSS | PEELING CONCRETE |
| 226.4 | SAV | SEVERE AGG |
| 0 | AMH | 4:05 AM |
| 157.7 | MGO | 20% MAG COAT FINISH |
| 332.8 | AMH | 4:35AM |
| 62.1 | MGO | MAG COAT 20% START |
| 0 | MWL | — |
| 8 | MGO | 21" NRCP |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 332.6 | SAV | SEVERE AGG SPORATIC |
| 332.6 | SSS | BLISTERING PEELING CONCRETE |
| 331.2 | SAP | SEVERE AGG |
| 0 | MWM | — |