B 0380_B 0379_1162018_021354.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
8 ft. - General Observation - 21" NRCP
41.9 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
42 ft. - Surface Spalling, from 09 to 12 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
44.3 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
200.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
294.5 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
295.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, - SEVERE AGG
302.4 ft. - General Observation - MAG COAT 60% START
| Distance | Code | Observation |
|---|---|---|
| 294.5 | SAV | SEVERE AGG |
| 200.6 | SSS | PEELING CONCRETE |
| 328.6 | SAV | SEVERE AGG SPORATIC |
| 328.6 | MGO | MAG COAT 60% FINISH |
| 302.4 | MGO | MAG COAT 60% START |
| 41.9 | SAV | SEVERE AGG |
| 328.9 | AMH | 3:30AM |
| 42 | SSS | PEELING CONCRETE |
| 0 | AMH | 2:30AM |
| 0 | MWM | — |
| 0 | MWL | — |
| 44.3 | SAV | SEVERE AGG SPORATIC |
| 8 | MGO | 21" NRCP |
| 328.6 | SSS | BLISTERING PEELING CONCRETE |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 295.2 | SAP | SEVERE AGG |