Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 26, 2017, 07:12 PM
  • 03 0080_03 0079_15082017_150749.mp4

Date
07/26/2017
W/O
1590881
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00366
PipeID
P05102
Time
12:12 PM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3993
Sewer Name
03 LOS COYOTES DIAGONAL TRUNK
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
05
Purpose
Routine Assessment
Project
WO_646534_TV03011_JUL2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
03 0080
Downstream MH
03 0079
Dir. of Survey
Downstream
Length Surveyed
356.3 ft.
Total Length
356.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
422M
O&M Rating
148
Overall Index
2
Overall Quick
Overall Rating
148
Pipe schematic from manhole 03 0080 to 03 0079
MH: 03 0080MH: 03 0079downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 03 00802 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start56 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"60 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"144.1 ft. TBI - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 6", 5"168.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"172 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"202.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"255.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"259.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"286 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"305 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"309 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"343.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"353.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish356.3 ft. AMH - Downstream Manhole, Survey Ends - 03 0079

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 6", 5"

    144.1 ft. - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 6", 5"

Observations (18)

DistanceCodeObservation
259.1TFC
2DAGS
60TFC
305TFC
202.1TB
353.1DAGS
0MWM
356.3AMH03 0079
0MWL
255.1TF
286TB
172TF
0AMH03 0080
144.1TBI
309TFC
56TFC
343.1TB
168.1TFC

Properties (6)

additional_info
SC345560
custom_field_two
4
customer
LACSD
datetime
2017-07-26T12:12:30-07:00
documentation
PROPIPE
is_lateral_inspection
false