Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 21, 2016, 06:25 AM
  • 05 1468_05 1467_062016_232548.mpg

Date
06/20/2016
W/O
574372
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06690
Time
11:25 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3401
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
WO_574372_TV05300_JUNE2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
05 1468
Downstream MH
05 1467
Dir. of Survey
Downstream
Length Surveyed
321.7 ft.
Total Length
321.7 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
318
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
318
Pipe schematic from manhole 05 1468 to 05 1467
MH: 05 1468MH: 05 1467downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 14680 ft. MGO - General Observation - CONNECTION AT THE MH CAPPED 3 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start12.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"63.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"111.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"112.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES162.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"170.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"212.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"260 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"310.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"317.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish317.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish321.7 ft. AMH - Downstream Manhole, Survey Ends - 05 1467321.7 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    112.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
0AMH05 1468
0MGOCONNECTION AT THE MH CAPPED 3 O'CLOCK
321.7AMH05 1467
0MWL
310.4TFC
112.3CM
317.5SAP
0MWM
321.7MGOCONNECTION AT THE MH 3 O'CLOCK
63.5TFC
2.2SSS
162.2TFC
212.4TFC
260TFC
170.7TFC
12.7TFC
2.2SAP
317.5SSS
111.2TFC

Properties (6)

additional_info
SC305851
custom_field_two
2
customer
LACSD
datetime
2016-06-20T23:25:31-07:00
documentation
PROPIPE
is_lateral_inspection
false