Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 21, 2016, 08:18 AM
  • 05 1472_05 1471_062116_012008.mpg

Date
06/21/2016
W/O
574372
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06695
Time
1:18 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3401
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
WO_574372_TV05300_JUNE2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
05 1472
Downstream MH
05 1471
Dir. of Survey
Downstream
Length Surveyed
330.6 ft.
Total Length
330.6 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
325
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
325
Pipe schematic from manhole 05 1472 to 05 1471
MH: 05 1472MH: 05 1471downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 14720 ft. MGO - General Observation - CONNECTION AT THE MH CAPPED 3 O'CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start12.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"13.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish72.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"146.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"221.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"227.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"292.9 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"326.6 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish326.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish330.6 ft. AMH - Downstream Manhole, Survey Ends - 05 1471330.6 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    13.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
13.5SAP
2.2SAV
227.8TF
12.7TF
13.5SAV
2.2SSS
326.6SSS
221.2TF
72.3TF
326.6SAP
292.9TFA
0AMH05 1472
0MGOCONNECTION AT THE MH CAPPED 3 O'CLOCK
330.6AMH05 1471
0MWM
146.9TF
330.6MGOCONNECTION AT THE MH 3 O'CLOCK
0MWL

Properties (6)

additional_info
SC305851
custom_field_two
2
customer
LACSD
datetime
2016-06-21T01:18:07-07:00
documentation
PROPIPE
is_lateral_inspection
false