Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 21, 2016, 08:04 AM
  • 05 2330_05 1472_062116_010554.mpg

Date
06/21/2016
W/O
574372
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06696
Time
1:04 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3401
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
WO_574372_TV05300_JUNE2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
05 2330
Downstream MH
05 1472
Dir. of Survey
Downstream
Length Surveyed
253.5 ft.
Total Length
253.5 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
248
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
248
Pipe schematic from manhole 05 2330 to 05 1472
MH: 05 2330MH: 05 1472downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 5 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 23302.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"5.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start93.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"176.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"221.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"251.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish251.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish253.5 ft. MGO - General Observation - CONNECTION AT THE MH CAPPED 3 O'CLOCK253.5 ft. AMH - Downstream Manhole, Survey Ends - 05 1472

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MWM
2.9SAP
221.2TF
3.9TF
253.5MGOCONNECTION AT THE MH CAPPED 3 O'CLOCK
93.3TF
0MGOCONNECTION AT THE MH 5 O'CLOCK
251.6SSS
0MWL
5.8SSS
253.5AMH05 1472
176.8TF
0AMH05 2330
251.6SAP

Properties (6)

additional_info
SC305851
custom_field_two
2
customer
LACSD
datetime
2016-06-21T01:04:58-07:00
documentation
PROPIPE
is_lateral_inspection
false