B 0956_B 0037_8232017_045951.mp4
8 ft. - General Observation - 78" RCP
19.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
42.4 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG
79.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
123 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC
141 ft. - General Observation - 78" RCP
141 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE
297.7 ft. - General Observation - 78" RCP
500 ft. - General Observation - 78" RCP
574 ft. - General Observation - 78" RCP
574.5 ft. - General Observation - ZOOM 35'
| Distance | Code | Observation |
|---|---|---|
| 500 | MGO | 78" RCP |
| 609.6 | AMH | 5:30AM |
| 79.6 | SSS | PEELING CONCRETE |
| 297.7 | MGO | 78" RCP |
| 574 | MGO | 78" RCP |
| 609.2 | SAP | SEVERE AGG SPORATIC |
| 0 | AMH | 4:55AM |
| 141 | MGO | 78" RCP |
| 0 | MWL | — |
| 0 | MWM | — |
| 8 | MGO | 78" RCP |
| 609.2 | SSS | PEELING CONCRETE |
| 123 | SAP | SEVERE AGG SPORATIC |
| 141 | SSS | PEELING CONCRETE |
| 574.5 | MGO | ZOOM 35' |
| 19.2 | SAP | SEVERE AGG SPORATIC |
| 42.4 | SAP | SEVERE AGG |