H 0184_H 0183_8222017_091753.mp4
8 ft. - General Observation - SMALL RIBCAGE EFFECT 11 TO 1 O CLOCK
8.5 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
69.8 ft. - General Observation - 70% MAG COAT
87.4 ft. - Surface Reinforcement Visible, from 11 to 12 o'clock, within 8 inches of joint: NO - POSSIBLE REBAR
121.9 ft. - Surface Reinforcement Visible, from 10 to 12 o'clock, within 8 inches of joint: YES
135.9 ft. - Surface Reinforcement Visible, from 12 to 02 o'clock, within 8 inches of joint: YES, Start
157.1 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start
539.9 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO
563.8 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO, Start
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 0915 |
| 583.5 | SRV | — |
| 157.1 | SRV | — |
| 0 | MWM | — |
| 589.6 | AMH | 0950 |
| 518.4 | SRV | — |
| 157.1 | SRV | — |
| 8.5 | SAP | — |
| 539.9 | SRV | — |
| 69.8 | MGO | 70% MAG COAT |
| 563.8 | SRV | — |
| 583.5 | DAGS | — |
| 583.5 | SAP | — |
| 135.9 | SRV | — |
| 121.9 | SRV | — |
| 0 | MWL | — |
| 8 | MGO | SMALL RIBCAGE EFFECT 11 TO 1 O CLOCK |
| 87.4 | SRV | POSSIBLE REBAR |
| 8 | DAGS | — |