Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 20, 2017, 10:26 AM
  • 05 1267_05 1266 _20062017_050349.mp4

Date
06/20/2017
W/O
640992
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00518
PipeID
P06479
Time
3:26 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3974-SC342132
Sewer Name
05 SO HAWTHORNE-WARFIELD AV EXT TR, SECT 4
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
19
Purpose
Routine Assessment
Project
WO_640992_TV05332_JUN2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1267
Downstream MH
05 1266
Dir. of Survey
Downstream
Length Surveyed
276.2 ft.
Total Length
276.2 ft.
Structural Index
3
Structural Quick
3D21
Structural Rating
77
O&M Index
2
O&M Quick
412J
O&M Rating
112
Overall Index
2
Overall Quick
Overall Rating
189
Pipe schematic from manhole 05 1267 to 05 1266
MH: 05 1267MH: 05 1266downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 12670 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area6.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start24.6 ft. FC - Fracture Circumferential, from 12 to 01 o'clock, within 8 inches of joint: YES50.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"102.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"114 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"145.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6"148 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start149.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"196.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6"200.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"244.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6"248 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"274.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish274.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish276.2 ft. AMH - Downstream Manhole, Survey Ends - 05 1266

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    6.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Circumferential, from 12 to 01 o'clock, within 8 inches of joint: YES

    24.6 ft. - Fracture Circumferential, from 12 to 01 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    148 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
0AMH05 1267
248TF
6.1DAGS
0MWM
196.7TF
114TF
274.5DAGS
149.3TF
50.9TFC
0MWL
276.2AMH05 1266
274.5CM
102.2TF
244.3TF
148CM
24.6FC
145.3TF
200.5TF

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2017-06-20T03:26:28-07:00