02 1596_02 1595_20160816_015053.mpg
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
39.4 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"
75.4 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"
77.9 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"
83.3 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"
86.2 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"
105.8 ft. - Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES
108.8 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES
121.5 ft. - Repair Patch, from 12 to 12 o'clock, within 8 inches of joint: YES, Start - RPR
131.3 ft. - Tap Factory Made Abandoned, at 10 o'clock, -, within 8 inches of joint: NO, 4"
142.9 ft. - Tap Factory Made Abandoned, at 02 o'clock, -, within 8 inches of joint: NO, 4"
172.8 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4", 4"
175.2 ft. - Tap Factory Made Abandoned, at 02 o'clock, -, within 8 inches of joint: NO, 4"
189.9 ft. - Tap Factory Made Abandoned, at 10 o'clock, -, within 8 inches of joint: NO, 4"
210.4 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"
| Distance | Code | Observation |
|---|---|---|
| 0 | MGO | CONNECTION AT THE MH 3 O'CLOCK |
| 217.3 | AMH | 02 1595 |
| 131.3 | TFB | — |
| 0 | MWL | — |
| 0 | MGO | CONNECTION AT THE MH 9 O'CLOCK |
| 86.2 | TFC | — |
| 175.2 | TFB | — |
| 77.9 | TFC | — |
| 210.4 | TFA | — |
| 105.8 | FC | — |
| 75.4 | TFA | — |
| 217.3 | VC | — |
| 172.8 | TFC | — |
| 217.3 | MGO | CONNECTION AT THE MH 9 O'CLOCK |
| 39.4 | TF | — |
| 214.4 | DAGS | — |
| 121.5 | RPP | RPR |
| 142.9 | TFB | — |
| 131.3 | RPP | RPR |
| 108.8 | CM | — |
| 189.9 | TFB | — |
| 0 | AMH | 02 1596 |
| 0 | VC | — |
| 2 | DAGS | — |
| 0 | MWM | — |
| 83.3 | TFC | — |