Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 29, 2017, 10:40 AM
  • 16 0535_16 0534 _29092017_034038.mp4

Date
09/29/2017
W/O
663060
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00659
PipeID
P13586
Time
3:40 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4281
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_630370_TV05315_AUG2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
16 0535
Downstream MH
16 0534
Dir. of Survey
Downstream
Length Surveyed
227.7 ft.
Total Length
227.7 ft.
Structural Index
3
Structural Quick
3H00
Structural Rating
132
O&M Index
2
O&M Quick
2H11
O&M Rating
89
Overall Index
2
Overall Quick
Overall Rating
221
Pipe schematic from manhole 16 0535 to 16 0534
MH: 16 0535MH: 16 0534downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. AMH - Upstream Manhole, Survey Begins - 16 05350 ft. MWM - Water Mark, 15 %of cross sectional area3.9 ft. MGO - General Observation - MAG COAT START3.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"31.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"80.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"83.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"132.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"136 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"188.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"192.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"220.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"225.6 ft. MGO - General Observation - MAG COAT FINISH225.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish225.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish227.7 ft. AMH - Downstream Manhole, Survey Ends - 16 0534

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
220.1TFC
3.9MGOMAG COAT START
0MWL
132.5TFA
227.7AMH16 0534
31.3TFA
225.6MGOMAG COAT FINISH
80.1TFC
83.9TFC
0VC
3.9DAGS
3.9SAV
225.6DAGS
0AMH16 0535
27.3TFC
188.2TFC
0MWM
225.6SAV
192.9TFA
136TFC

Properties (4)

additional_info
SC352127
custom_field_two
3
customer
LACSD
datetime
2017-09-29T03:40:29-07:00