Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 19, 2017, 09:22 AM
  • 02 1863_02 1862 _19092017_022232.mpg

Date
09/19/2017
W/O
658424
Weather
Dry
Operator/Surveyor
CORTEZ ESTEBAN
Sewer ID
Z00255
PipeID
P04222
Time
2:22 AM
Certificate
U-209-8148
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4929
Sewer Name
02 DOWNEY-BELLFLOWER RELIEF TRUNK, SECTION 2
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
22
Purpose
Routine Assessment
Project
WO_630370_TV05315_AUG2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 1863
Downstream MH
02 1862
Dir. of Survey
Downstream
Length Surveyed
470.5 ft.
Total Length
470.5 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 02 1863 to 02 1862
MH: 02 1863MH: 02 1862downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 186326.7 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES385.3 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES470.5 ft. AMH - Downstream Manhole, Survey Ends - 02 1862470.5 ft. MGO - General Observation - FOOTAGE DOES NOT MATCH WORK LIST

Observation photos (1)

  • Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES

    385.3 ft. - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES

Observations (7)

DistanceCodeObservation
470.5AMH02 1862
470.5MGOFOOTAGE DOES NOT MATCH WORK LIST
0MWL
0MWM
26.7DSZ
385.3CL
0AMH02 1863

Properties (4)

additional_info
SC345837
custom_field_two
4
customer
LACSD
datetime
2017-09-19T02:22:20-07:00