Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 12, 2017, 10:46 AM
Date
09/12/2017
W/O
657840
Weather
Dry
Operator/Surveyor
CORTEZ ESTEBAN
Sewer ID
Z00199
PipeID
P01384
Time
3:46 AM
Certificate
U-209-848
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4922
Sewer Name
01 CALIFORNIA AVENUE EXTENSION TRUNK
City
SOUTH GATE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
14
Purpose
Routine Assessment
Project
WO_630370_TV05315_AUG2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
01 0675
Downstream MH
01 0674B
Dir. of Survey
Downstream
Length Surveyed
45.8 ft.
Total Length
45.8 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 01 0675 to 01 0674B
MH: 01 0675MH: 01 0674Bdownstream0 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH0 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - PIPE SIZE POSSIBLE 33' RCP0 ft. AMH - Upstream Manhole, Survey Begins - 01 06752.4 ft. MGO - General Observation - MAGNEZIUM H.O COATING start3.4 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start40.6 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish42.7 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish44 ft. MGO - General Observation - PEELING/FLAKING/SPALLING THROUGHOUT THE REACH45.8 ft. AMH - Downstream Manhole, Survey Ends - 01 0674B

Observation photos (1)

  • Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    3.4 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
40.6SAV
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
44MGOPEELING/FLAKING/SPALLING THROUGHOUT THE REACH
0MWL
0MWM
0MGOPIPE SIZE POSSIBLE 33' RCP
42.7MGOMAGNEZIUM H.O COATING finish
2.4MGOMAGNEZIUM H.O COATING start
3.4SAV
0AMH01 0675
45.8AMH01 0674B

Properties (4)

additional_info
SC345829
custom_field_two
3
customer
LACSD
datetime
2017-09-12T03:46:11-07:00