Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 7, 2018, 06:56 AM
  • 22 1123_22 1122A _06092018_235654.mp4

Date
09/06/2018
W/O
724242
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00820
PipeID
P17503
Time
11:56 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5995
Sewer Name
22 POLYMER PLANT WASTE WATER DISPOSAL LINE
City
AZUSA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
11
Purpose
Routine Assessment
Project
WO_724242_TV22115_SEP2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
22 1123
Downstream MH
22 1122A
Dir. of Survey
Downstream
Length Surveyed
360.2 ft.
Total Length
360.2 ft.
Structural Index
3
Structural Quick
3321
Structural Rating
11
O&M Index
2
O&M Quick
2J1C
O&M Rating
131
Overall Index
2
Overall Quick
Overall Rating
142
Pipe schematic from manhole 22 1123 to 22 1122A
MH: 22 1123MH: 22 1122Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 11230 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area7.7 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES29.9 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Start52.5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES61.9 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES133.9 ft. RFJ - Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YES137.1 ft. RFJ - Roots Fine Joint, from 09 to 10 o'clock, within 8 inches of joint: YES166.8 ft. RFJ - Roots Fine Joint, at 04 o'clock, within 8 inches of joint: YES172 ft. RFJ - Roots Fine Joint, at 04 o'clock, within 8 inches of joint: YES178.1 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start197.8 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"252.5 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish293.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES297.5 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Finish324.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"352.6 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start360.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish360.2 ft. AMH - Downstream Manhole, Survey Ends - 22 1122A

Observation photos (14)

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    7.7 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Deposits Settled Other,  5 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: NO, Start

    29.9 ft. - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    52.5 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    61.9 ft. - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YES

    133.9 ft. - Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, from 09 to 10 o'clock, within 8 inches of joint: YES

    137.1 ft. - Roots Fine Joint, from 09 to 10 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, at 04 o'clock, within 8 inches of joint: YES

    166.8 ft. - Roots Fine Joint, at 04 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, at 04 o'clock, within 8 inches of joint: YES

    172 ft. - Roots Fine Joint, at 04 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    178.1 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    197.8 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    293.2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    324.2 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Deposits Settled Other,  10 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start

    352.6 ft. - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Finish

    360.2 ft. - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish

Observations (20)

DistanceCodeObservation
29.9DSZ
7.7CL
133.9RFJ
297.5DSZ
293.2CM
52.5CM
137.1RFJ
172RFJ
0AMH22 1123
252.5RFJ
166.8RFJ
178.1RFJ
61.9CM
352.6DSZ
0MWM
324.2TB
197.8TB
360.2DSZ
360.2AMH22 1122A
0MWL

Properties (5)

additional_info
SC364810
custom_field_two
3
customer
LACSD
datetime
2018-09-06T23:56:31-07:00
year_laid
27163