Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 13, 2018, 04:31 AM
  • 16 0194_16 0193_12092018_214129.mp4

Date
09/12/2018
W/O
723757
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00646
PipeID
P13237
Time
9:31 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6002
Sewer Name
16 ARROYO SECO TRUNK, SECTION 3
City
SOUTH PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Routine Assessment
Project
WO_723757_TV16114_SEP2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
16 0194
Downstream MH
16 0193
Dir. of Survey
Downstream
Length Surveyed
87.9 ft.
Total Length
87.9 ft.
Structural Index
3
Structural Quick
563B
Structural Rating
106
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
106
Pipe schematic from manhole 16 0194 to 16 0193
MH: 16 0194MH: 16 0193downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 01947.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start16.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start27.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish27.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start58.6 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start87.9 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish87.9 ft. AMH - Downstream Manhole, Survey Ends - 16 019387.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish87.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    16.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    27.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    58.6 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
87.9SRV
87.9AMH16 0193
87.9SAP
27.1SAV
16.2SSS
0MWL
58.6SRV
0MWM
0AMH16 0194
27.1SAP
7.9SAV
87.9SSS

Properties (4)

additional_info
SC364817
custom_field_two
2
customer
LACSD
datetime
2018-09-12T21:31:51-07:00