Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 13, 2018, 05:23 AM
  • 16 0191_16 0190_12092018_222516.mp4

Date
09/12/2018
W/O
723757
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00646
PipeID
P13234
Time
10:23 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6002
Sewer Name
16 ARROYO SECO TRUNK, SECTION 3
City
SOUTH PASADENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Routine Assessment
Project
WO_723757_TV16114_SEP2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
16 0191
Downstream MH
16 0190
Dir. of Survey
Downstream
Length Surveyed
270.3 ft.
Total Length
270.3 ft.
Structural Index
3
Structural Quick
3J2I
Structural Rating
261
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
3
Overall Quick
Overall Rating
262
Pipe schematic from manhole 16 0191 to 16 0190
MH: 16 0191MH: 16 0190downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 10 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 16 01910 ft. MWL - Water Level, 35 %of cross sectional area2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start33.3 ft. RFJ - Roots Fine Joint, from 11 to 02 o'clock, within 8 inches of joint: YES89.2 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"128 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"212.2 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"267.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish270.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish270.3 ft. AMH - Downstream Manhole, Survey Ends - 16 0190

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    15.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 11 to 02 o'clock, within 8 inches of joint: YES

    33.3 ft. - Roots Fine Joint, from 11 to 02 o'clock, within 8 inches of joint: YES

Observations (13)

DistanceCodeObservation
0MWM
267.8SAP
212.2TF
0MGOCONNECTION AT MH 10 O'CLOCK
15.7SSS
2.1SAP
0AMH16 0191
270.3SSS
270.3AMH16 0190
33.3RFJ
0MWL
128TF
89.2TF

Properties (4)

additional_info
SC364817
custom_field_two
2
customer
LACSD
datetime
2018-09-12T22:23:17-07:00