Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 3, 2018, 08:17 AM
  • 02 1805A_02 1805_03102018_011748.mp4

Date
10/03/2018
W/O
729701
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00292
PipeID
P04151
Time
1:17 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6125
Sewer Name
02 MONTEREY PARK RELIEF TRUNK
City
EAST LOS ANGELES
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_729701_TV02108_OCT2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
02 1805A
Downstream MH
02 1805
Dir. of Survey
Downstream
Length Surveyed
196.2 ft.
Total Length
196.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 02 1805A to 02 1805
MH: 02 1805AMH: 02 1805downstream0 ft. MWM - Water Mark, 5 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 1805A3.1 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"3.1 ft. MGO - General Observation - PIPE HAS LINER4.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"7.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"25.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"67.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"85.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"108.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"127.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"147.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"150.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"177.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"189.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"196.2 ft. AMH - Downstream Manhole, Survey Ends - 02 1805

Observations (17)

DistanceCodeObservation
4.1TF
150.5TF
147.8TF
0MWM
85.1TF
196.2AMH02 1805
67.1TF
0MWL
3.1TF
3.1MGOPIPE HAS LINER
177.6TF
189.5TF
7.8TF
108.8TF
0AMH02 1805A
25.3TF
127.2TF

Properties (4)

additional_info
SC364845
custom_field_two
3
customer
LACSD
datetime
2018-10-03T01:17:23-07:00