Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 23, 2015, 12:23 PM
  • 15 0651_15 0650_20151123_043800.mp4

Date
11/23/2015
W/O
531432
Weather
Dry
Operator/Surveyor
ERU
Sewer ID
Z00606
PipeID
P12923
Time
4:23 AM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2287
Sewer Name
15 GRAND AVENUE TRUNK
City
SAN GABRIEL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_531423_TV15027_OCT2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
15 0650
Downstream MH
15 0651
Dir. of Survey
Upstream
Length Surveyed
296.9 ft.
Total Length
296.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 15 0650 to 15 0651
MH: 15 0650MH: 15 0651upstream0 ft. AMH - Upstream Manhole, Survey Ends - 04384.6 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish10.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"61.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"108.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"113.8 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"114.6 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"119.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"167.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"179.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"192 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"216 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"229.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"272.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"282.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"289.5 ft. MGO - General Observation - MAG COAT THROUGHOUT PIPE 35%289.8 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start296.9 ft. AMH - Downstream Manhole, Survey Begins - 0425296.9 ft. MWL - Water Level, 15 %of cross sectional area296.9 ft. MWM - Water Mark, 25 %of cross sectional area

Observation photos (1)

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7.1 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
104.9TFC
235.4TFA
188.1TFC
24.8TFC
296.9AMH0438
177.5TFA
117.2TFA
292.3SAV
80.9TFA
7.4MGOMAG COAT THROUGHOUT PIPE 35%
129.2TFC
0AMH0425
286.8TFC
67.2TFA
7.1SAV
182.3TBA
0MWL
183.1TBA
0MWM
14.5TFA

Properties (4)

additional_info
SC205369
custom_field_two
3
customer
LACSD
datetime
2015-11-23T04:23:38-08:00