Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 26, 2017, 08:27 PM
  • 05 0006_05 0005A_12262017_123936.mp4

Date
12/26/2017
W/O
0674047
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00431
PipeID
P05291
Time
12:27 PM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7589
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
30
Purpose
Routine Assessment
Project
20171226SHO_DISTRICT_5_MAIN_TRUNK
Material
RCP-CTL
Shape
Circular
Height
54 in.
Upstream MH
05 0006
Downstream MH
05 0005A
Dir. of Survey
Downstream
Length Surveyed
16.1 ft.
Total Length
16.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
4
Pipe schematic from manhole 05 0006 to 05 0005A
MH: 05 0006MH: 05 0005Adownstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12400 ft. MWL - Water Level, 40 %of cross sectional area8 ft. MGO - General Observation - 95% MAG COAT INTACT16.1 ft. AMH - Downstream Manhole, Survey Ends - 1245

Observation photos (1)

  • General Observation - 95% MAG COAT INTACT

    8 ft. - General Observation - 95% MAG COAT INTACT

Observations (5)

DistanceCodeObservation
8MGO95% MAG COAT INTACT
0MWM
0AMH1240
0MWL
16.1AMH1245

Properties (4)

custom_field_three
95% MAG COAT
custom_field_two
5
customer
LACSD
datetime
2017-12-26T12:27:11-08:00