Wastewater/Activity/PacpInspection/1.0Dec 18, 2017, 11:39 AM
  • Section#6_J 0222A_J 0222__12182017__G6886.mp4

Date
12/18/2017
W/O
0624519
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00057
PipeID
P11468
Time
3:39 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6886
Sewer Name
J JOINT OUTFALL J - UNIT 1E
City
PALO VERDES
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
47
Purpose
Capital Improvement Program Assesment
Project
20171216MDM_JOINT_OUTFALL_J_UNIT_1E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
J 0222A
Downstream MH
J 0222
Dir. of Survey
Downstream
Length Surveyed
433.7 ft.
Total Length
433.7 ft.
Structural Index
3
Structural Quick
3S2Q
Structural Rating
473
O&M Index
2
O&M Quick
2400
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
481
Pipe schematic from manhole J 0222A to J 0222
MH: J 0222AMH: J 0222downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:40AM0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE8 ft. MGO - General Observation - 27" RCP18.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC21.9 ft. SAV - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG29.8 ft. SAV - Surface Aggregate Visible, from 12 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG59.8 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK84.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG98.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG147.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG224.1 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, at 04 o'clock, , within 8 inches of joint: NO - SLUDGE & RAGS DEBRIE270.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE290.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - ROCKS306.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE320.1 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - ROCK433.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC433.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE433.2 ft. MGO - General Observation - MH CONN 9:00 OPEN433.7 ft. AMH - Downstream Manhole, Survey Ends - 5:20AM

Observation photos (11)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    18.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    21.9 ft. - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 12 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    29.8 ft. - Surface Aggregate Visible, from 12 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - ROCK

    59.8 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    84.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    98.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Deposits Attached Other, 5 %of cross sectional area, at 04 o'clock,  , within 8 inches of joint: NO - SLUDGE & RAGS DEBRIE

    224.1 ft. - Deposits Attached Other, 5 %of cross sectional area, at 04 o'clock, , within 8 inches of joint: NO - SLUDGE & RAGS DEBRIE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    270.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: NO - ROCKS

    290.2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - ROCKS

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE

    306.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE

Observations (22)

DistanceCodeObservation
59.8DSZROCK
0AMH4:40AM
290.2DSZROCKS
433.7AMH5:20AM
84.2SAPSEVERE AGG
433.2SAVSEVERE AGG SPORATIC
306.9SSSBLISTERING PEELING CONCRETE
320.1DSZROCK
433.2SSSBLISTERING PEELING CONCRETE
98.2SAPSEVERE AGG
0MGOMH CONN 9:00 ACTIVE
21.9SAVSEVERE AGG
224.1DAZSLUDGE & RAGS DEBRIE
2SSSBLISTERING PEELING CONCRETE
29.8SAVSEVERE AGG
0MWM
8MGO27" RCP
0MWL
147.9SAPSEVERE AGG
18.4SAVSEVERE AGG SPORATIC
270.3SSSPEELING CONCRETE
433.2MGOMH CONN 9:00 OPEN

Properties (4)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2017-12-18T03:39:48-08:00