Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 16, 2016, 09:06 AM
  • 02 1592A_02 1592_20160816_031532.mpg

Date
08/16/2016
W/O
585987
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00231
PipeID
P04047
Time
2:06 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3420
Sewer Name
02 ARIZONA AVENUE TRUNK, SECTION 2
City
LOS ANGELES
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
08
Purpose
Routine Assessment
Project
WO_585987_TV02010_AUG2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
02 1592A
Downstream MH
02 1592
Dir. of Survey
Downstream
Length Surveyed
160.7 ft.
Total Length
160.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2E12
O&M Rating
64
Overall Index
2
Overall Quick
Overall Rating
64
Pipe schematic from manhole 02 1592A to 02 1592
MH: 02 1592AMH: 02 1592downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 1592A0 ft. MGO - General Observation - CONNECTION AT THE MH 9 O'CLOCK0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. VC - Vermin Cockroach2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start55 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 4"95.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 4"158.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish160.7 ft. AMH - Downstream Manhole, Survey Ends - 02 1592160.7 ft. VC - Vermin Cockroach

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 4"

    55 ft. - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 4"

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 4"

    95.9 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 4"

Observations (11)

DistanceCodeObservation
0AMH02 1592A
0MGOCONNECTION AT THE MH 9 O'CLOCK
158.2DAGS
0MWM
2DAGS
160.7AMH02 1592
95.9TF
0MWL
0VC
55TB
160.7VC

Properties (4)

additional_info
SC305973
custom_field_two
4
customer
LACSD
datetime
2016-08-16T02:06:15-07:00