Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 20, 2016, 09:12 AM
  • 05 1654_05 1653 _062016_021258.mpg

Date
06/20/2016
W/O
563399
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00539
PipeID
P06877
Time
2:12 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3399
Sewer Name
05 WEST TORRANCE TRUNK
City
TORRANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
30
Purpose
Routine Assessment
Project
WO_563399_TV05132_JUNE2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1654
Downstream MH
05 1653
Dir. of Survey
Downstream
Length Surveyed
298.6 ft.
Total Length
298.6 ft.
Structural Index
3
Structural Quick
3J21
Structural Rating
167
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
171
Pipe schematic from manhole 05 1654 to 05 1653
MH: 05 1654MH: 05 1653downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 16540 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area10.3 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES22.7 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start38.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"138.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"186.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"234.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"281 ft. OBR - Obstacles Rocks, 25 %of cross sectional area, at 06 o'clock286.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"298.6 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK298.6 ft. MGO - General Observation - CONNECTION AT THE MH CAPPED 9 O'CLOCK298.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish298.6 ft. AMH - Downstream Manhole, Survey Ends - 05 1653

Observation photos (3)

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    10.3 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    22.7 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Rocks, 25 %of cross sectional area, at 06 o'clock

    281 ft. - Obstacles Rocks, 25 %of cross sectional area, at 06 o'clock

Observations (15)

DistanceCodeObservation
22.7CM
234.2TFC
186.5TFC
38.1TFC
298.6MGOCONNECTION AT THE MH 3 O'CLOCK
298.6MGOCONNECTION AT THE MH CAPPED 9 O'CLOCK
0AMH05 1654
10.3CL
0MWL
281OBR
0MWM
138.4TFC
298.6CM
286.5TF
298.6AMH05 1653

Properties (4)

additional_info
SC300399
custom_field_two
3
customer
LACSD
datetime
2016-06-20T02:12:48-07:00