B 1276_B 1275_842017_030535.mp4
2 ft. - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - General Observation - MAG COAT 90% START 8:00 TO 4:00
2 ft. - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
16.3 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG SPORATIC
41.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - FLAKING CONCRETE
65.6 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
102.7 ft. - Roots Medium Joint, from 03 to 05 o'clock, 20 %, within 8 inches of joint: YESR
122.1 ft. - Roots Medium Joint, from 07 to 10 o'clock, 15 %, within 8 inches of joint: YESR
144.1 ft. - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - ROCKS
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 199.2 | SAV | SEVERE AGG |
| 199.2 | SAP | SEVERE AGG |
| 16.3 | SAV | SEVERE AGG SPORATIC |
| 144.1 | DSZ | ROCKS |
| 113.8 | RFJ | 4% |
| 199.2 | MGO | MAG COAT 90% FINISH |
| 152.5 | SAV | SEVERE AGG |
| 65.6 | SAP | SEVERE AGG |
| 2 | SAP | SEVERE AGG |
| 199.6 | AMH | 3:30AM |
| 122.1 | RMJ | — |
| 0 | MWM | — |
| 71.3 | SAP | SEVERE AGG |
| 102.7 | RMJ | — |
| 41.2 | SSS | FLAKING CONCRETE |
| 154.4 | MWM | — |
| 2 | MGO | MAG COAT 90% START 8:00 TO 4:00 |
| 199.2 | SAP | SEVERE AGG |
| 116.2 | DSZ | ROCK |
| 127.3 | RFJ | 4% |
| 2 | SAP | SEVERE AGG |
| 199.2 | SSS | FLAKING CONCRETE |
| 0 | AMH | 3:05AM |