Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 26, 2017, 08:28 AM
  • 20 0184_20 0183_01262017_002934.mp4

Date
01/26/2017
W/O
618960
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00739
PipeID
P19108
Time
12:28 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4221
Sewer Name
20 OUTFALL TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
08
Purpose
Routine Assessment
Project
WO_618960_TV20021_FEB2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
20 0184
Downstream MH
20 0183
Dir. of Survey
Downstream
Length Surveyed
335.8 ft.
Total Length
335.8 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
469
Pipe schematic from manhole 20 0184 to 20 0183
MH: 20 0184MH: 20 0183downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01840 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start44.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"47.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"94.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"97.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"142.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"146 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"195.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"198.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"244.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"247.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"293.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"297.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"335.8 ft. AMH - Downstream Manhole, Survey Ends - 20 0183335.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish335.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish335.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
146TFC
195.7TFC
44.4TFC
335.8AMH20 0183
198.5TFC
247.6TFC
244.2TFC
297.4TFC
0MWM
2DAGS
335.8SAV
0AMH20 0184
335.8SSS
94.1TFC
47.5TFC
293.6TFC
0MWL
2SAV
142.6TFC
2SSS
97.1TFC
335.8DAGS

Properties (4)

additional_info
SC306723
custom_field_two
3
customer
LACSD
datetime
2017-01-26T00:28:50-08:00