Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 26, 2017, 07:31 AM
  • 20 0186_20 0185_01252017_233358.mp4

Date
01/25/2017
W/O
618960
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00739
PipeID
P19110
Time
11:31 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4221
Sewer Name
20 OUTFALL TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
08
Purpose
Routine Assessment
Project
WO_618960_TV20021_FEB2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
20 0186
Downstream MH
20 0185
Dir. of Survey
Downstream
Length Surveyed
332.3 ft.
Total Length
332.3 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
330
O&M Index
2
O&M Quick
2L00
O&M Rating
132
Overall Index
2
Overall Quick
Overall Rating
462
Pipe schematic from manhole 20 0186 to 20 0185
MH: 20 0186MH: 20 0185downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CAPPED CONNECTION AT 3 O"CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01860.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start41.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"43.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"46.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"92.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"139.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"142.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"188.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"191.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"243.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"247.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"293.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"296.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"332.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish332.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish332.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish332.3 ft. AMH - Downstream Manhole, Survey Ends - 20 0185

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    0.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
2DAGS
43.3TFC
0MWM
142.2TFC
139.5TFC
0MGOCAPPED CONNECTION AT 3 O"CLOCK
92.4TFA
332.3SSS
332.3DAGS
332.3SAV
46.9TFC
293.2TFC
332.3AMH20 0185
0.7SAV
0MWL
296.4TF
247.2TFC
188.3TFC
243.8TFC
191.7TFC
41.3TFA
0AMH20 0186
2SSS

Properties (4)

additional_info
SC306723
custom_field_two
2
customer
LACSD
datetime
2017-01-25T23:31:53-08:00