Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 5, 2018, 09:45 AM
  • 16 0553_16 0552 _05102018_024609.mp4

Date
10/05/2018
W/O
729441
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00659
PipeID
P13604
Time
2:45 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6135
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_729441_TV16077_OCT2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
16 0553
Downstream MH
16 0552
Dir. of Survey
Downstream
Length Surveyed
99.3 ft.
Total Length
99.3 ft.
Structural Index
3
Structural Quick
3C00
Structural Rating
57
O&M Index
2
O&M Quick
2C00
O&M Rating
38
Overall Index
3
Overall Quick
Overall Rating
95
Pipe schematic from manhole 16 0553 to 16 0552
MH: 16 0553MH: 16 0552downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05530 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start34.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"82.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"86.2 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"98.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish98.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish98.2 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK99.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE99.3 ft. AMH - Downstream Manhole, Survey Ends - 16 0552

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    99.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
0MWL
99.3MGOCOCKROACHES IN MANHOLE
86.2TBA
34.9TFA
2SAP
98.2DAGS
0AMH16 0553
98.2SAP
0MWM
99.3AMH16 0552
82.7TFC
98.2MGOACTIVE CONNECTION AT MH 9 O'CLOCK
2DAGS

Properties (4)

additional_info
SC365121
custom_field_two
2
customer
LACSD
datetime
2018-10-05T02:45:50-07:00