Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 5, 2018, 10:28 AM
  • 16 0571_16 0570 _05102018_032848.mp4

Date
10/05/2018
W/O
729441
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00659
PipeID
P13622
Time
3:28 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6135
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
WO_729441_TV16077_OCT2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22 in.
Width
22 in.
Upstream MH
16 0571
Downstream MH
16 0570
Dir. of Survey
Downstream
Length Surveyed
252.7 ft.
Total Length
252.7 ft.
Structural Index
4
Structural Quick
5H3I
Structural Rating
385
O&M Index
2
O&M Quick
2I00
O&M Rating
100
Overall Index
3
Overall Quick
Overall Rating
485
Pipe schematic from manhole 16 0571 to 16 0570
MH: 16 0571MH: 16 0570downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05712 ft. SAP - Surface Aggregate Projecting, from 05 to 07 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start8.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"15.4 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start31.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"60.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"90.5 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"106.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"126.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"158.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"178.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"215.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"252.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish252.7 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish252.7 ft. SAP - Surface Aggregate Projecting, from 05 to 07 o'clock, within 8 inches of joint: YES, Finish252.7 ft. AMH - Downstream Manhole, Survey Ends - 16 0570252.7 ft. MGO - General Observation - COCKROACHES IN MANHOLE252.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (4)

  • Surface Aggregate Projecting, from 05 to 07 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 05 to 07 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    15.4 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    252.7 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (21)

DistanceCodeObservation
106.6TFC
0MWL
31.1TF
60.1TFC
126.9TFC
178.8TFC
252.7DAGS
90.5TFA
158.6TFC
8.4TFC
215.3TFC
252.7SRV
2SAP
0MWM
252.7SAP
252.7AMH16 0570
252.7MGOCOCKROACHES IN MANHOLE
252.7MGOACTIVE CONNECTION AT MH 9 O'CLOCK
15.4SRV
2DAGS
0AMH16 0571

Properties (4)

additional_info
SC365121
custom_field_two
2
customer
LACSD
datetime
2018-10-05T03:28:31-07:00