Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 16, 2016, 06:40 AM
  • B 0330_B 0329_15032016_234020.mp4

Date
03/15/2016
W/O
557611
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00090
PipeID
P08855
Time
11:40 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3293
Sewer Name
B JOINT OUTFALL B - UNIT 4B
City
ROSEMEAD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
15
Purpose
Routine Assessment
Project
WO_557611_TV15046_2016MAR
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
B 0329
Downstream MH
B 0330
Dir. of Survey
Upstream
Length Surveyed
425.6 ft.
Total Length
425.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
3A2X
O&M Rating
281
Overall Index
2
Overall Quick
Overall Rating
281
Pipe schematic from manhole B 0329 to B 0330
MH: B 0329MH: B 0330upstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Ends - B 03301.6 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish1.6 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish286.3 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start337.7 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start368.1 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish423.6 ft. MGO - General Observation - MAG COATING 95%423.6 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start425.6 ft. MWL - Water Level, 20 %of cross sectional area425.6 ft. MGO - General Observation - COCKROACHES IN MANHOLE425.6 ft. AMH - Downstream Manhole, Survey Begins - B 0329

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Settled Other,  20 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    87.9 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    139.3 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    425.6 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
425.6MGOCOCKROACHES IN MANHOLE
424DAGS
0MWL
425.6MGOCONNECTION AT MH 9 O'CLOCK
0MGOCOCKROACHES IN MANHOLE
57.5DSZ
0AMHB 0329
2MGOMAG COATING 95%
2DSZ
424DSZ
425.6AMHB 0330
139.3DSZ
87.9DAGS

Properties (4)

additional_info
SC305417
custom_field_two
4
customer
LACSD
datetime
2016-03-15T23:40:04-07:00