Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 11, 2016, 06:11 AM
  • 05 0928_05 0927_10032016_222840.mp4

Date
03/10/2016
W/O
557872
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00547
PipeID
P06160
Time
10:11 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3283
Sewer Name
05 120TH STREET EXTENSION TRUNK
City
HAWTHORNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_557872_TV05175_2016MAR
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
05 0928
Downstream MH
05 0927
Dir. of Survey
Downstream
Length Surveyed
327.2 ft.
Total Length
327.2 ft.
Structural Index
3
Structural Quick
3W00
Structural Rating
363
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
3
Overall Quick
Overall Rating
493
Pipe schematic from manhole 05 0928 to 05 0927
MH: 05 0928MH: 05 0927downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 09280 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start23 ft. MGO - General Observation - MAG COATING 60%47.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start81.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"133.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"184.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"237.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"291.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"325.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish325.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish325.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.2 ft. AMH - Downstream Manhole, Survey Ends - 05 0927

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING 60%

    23 ft. - General Observation - MAG COATING 60%

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    47.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
291.5TFC
325.7SAV
2SAV
0AMH05 0928
237.2TFC
2DAGS
0MWM
47.1SAP
325.7DAGS
184.9TFC
81.1TFC
325.7SAP
23MGOMAG COATING 60%
0MWL
327.2AMH05 0927
133.5TFC

Properties (4)

additional_info
SC305407
custom_field_two
3
customer
LACSD
datetime
2016-03-10T22:11:15-08:00